1. The risk with less impact has been realized. There is no change in the triple constraint. PM should declare:
A) key stakeholders. B) interior design. C) None D) the affected members of the group. E) to complete the project.
2. The project manager creates a monthly report to top management. The project has collected the following information: AC = 100 PV = 80 EV = 120 Based on this information, the consumer price index reflects which of the following about the project?(Select 2answers)
A) There are over budget. B) This is earlier than planned. C) Late D) There are over budget. E) None
3. Which of the following affect the quality standards?
A) .MOU B) SLA C) WBS D) None E) MOA
4. Two members of the team approached the project with different ideas for the task. After listening to the thoughts of members of the team, not the project manager does not select any one, requiring both members to complete the task as originally planned. Which of the following methods konfliktl�¶snings design candidate?
A) compromise B) forcing C) smoothing D) avoids E) None
5. The project with a $ 235,000, 0.80 is the CPI and SPI is 1.20. Based on this information, which can later be key players in order to determine whether the project is?
A) The project is on budget and ahead of schedule. B) None C) on the draft budget and ahead of schedule. D) on the draft budget and behind schedule. E) on the draft budget and behind schedule.